Power Projects

Project Description Year Customer
By-pass Stacks of 2x126 MW (Frame 9 FA) Dashoguz Power Plant
Stack OD 6500 mm, Height. 31 m
2006 ÇALIK Enerji A.Ş. Turkmenistan
Swiss Hotel Cogeneration PP with 1,6 MW Capacity Deutz Gas Engine incl. Sound Enclosure 2006 İLTEKNO A.Ş.
Acıbadem Hospital Cogeneration Power Plant with 0,8 MW Capacity Deutz Gas Engine 2006 İLTEKNO A.Ş.
Waste Heat Recovery Boilers of 3x2MW SAY Energy PP with Deutz Gas Engines 2006 İLTEKNO A.Ş.
Waste Heat Recovery Boiler of 1x4 MW Kıvanç Energy PP with Deutz Gas Engine 2006 İLTEKNO A.Ş.
Exhaust Ducting and By-pass Stack of 37 MW Bosen CCPP 2005 BOSEN Enerji A.Åž.
All Waste Heat System of 5 MW NG Turbine Cogeneration Plant 2005 GRANISER Seramik A.Åž.
CAN Energy Cogeneration Power Plant with 4 MW Deutz Gas Engine incl. Sound Enclosure 2005 İLTEKNO A.Ş.
By-pass Stacks of 2x126 MW (Frame 9 FA) Ashgabat Power Plant
Stack OD 6500 mm, Height. 31 m
2005 ÇALIK Enerji A.Ş. Turkmenistan
Polyplex Cogeneration Power Plant with 4 MW Capacity Deutz Gas Engine 2005 İLTEKNO A.Ş.
Manufacturing of OTSG Ducting for 40 MW NG Turbine Cerkezkoy OSB Power Plant 2005 IST Innovative Steam Technologies / Canada
Double Diverting Dampers For Cogeneration PP Exhaust Ducts 2004 KARADENİZ Enerji Yatırımları A.Ş.
Metem 1 and 2 Cogeneration Power Plants with 2x4 MW and 3x4 MW Deutz N.Gas Engines 2004 METEM Enerji A.Åž.
Entek Koc Univ. 2x1.2 MW Cogeneration Power Plant with Deutz N.Gas Engines 2004 ILTEKNO A.Åž.
Compensators and Insulation of Exhaust Ducting of 2 x 4 MW NG Turbine Cogeneration Plant 2003 YURTBAY Seramik A.Åž.
By-pass Stack of 123.6 MW (Frame 9 FA) Buzmein Power Plant
Stack OD. 6700 mm, Height= 20 m
2003 ÇALIK Enerji A.Ş. Turkmenistan
By-pass Stack of 126.4 MW (3xFrame 6) Balkanabad Power Plant
Stack OD. 4000 mm, Height= 30 m
2003 ÇALIK Enerji A.Ş. Turkmenistan
Exhaust Ducting System of F.Oil Cogeneration Power Plant 2002 ARBIOGAZ A.Åž.
By-pass Stack of 126.4 MW (3xFrame 6) Turkmenbashi Power Plant
Stack OD. 4000, Height= 30 m
2002 ÇALIK Enerji A.Ş. Turkmenistan
Modification of HRSG of 37 MW Birlik Enerji F.Oil Cogeneration Plant 2002 AALBORG Industries Oy
11 MW Cogeneration Power Plant, 3xDiesel (Fuel Oil) MAN Holeby Engine 2001 DAS Enerji / Çetinkaya A.Ş.
2.By-Pass Stack Design, Manufacture and Erection For 75 MW CCPP 1999 TEKSER A.Åž.
By-Pass Stack Design, Manufacture and Erection For 75 MW CCPP 1998 TEKSER A.Åž.